Thanks boys!
I’ve been out doing some trail building this week, gotta best the snow we are supposed to get over the weekend. I’m hoping it barely snows at 7k, building is too much fun for me right now.
On this corner there was a giant oak root mass wrapped around large rocks so we had to get the tread elevated a bit. We built a step and shortly after I pulled a giant rock out another 12 feet downhill. Once I refilled the whole it was obvious that we had to build it into a low lying step down sender.
It should be real easy to get 15 to 25 feet of float off this thing. In the pictures it’s hard to see but there’s a nice long transition in there.