Gore Conditions (2014-2015)

579 messages Options
1234 ... 58
MikePom MikePom
Reply |
Open this post in threaded view
 

Gore Conditions (2014-2015)



Counting down to Opening Day at Gore
Gorefarmhouse Gorefarmhouse
Reply |
Open this post in threaded view
 

Re: Gore Conditions

According to a longtime employee to whom I spoke with on Friday night, every white board in every office up at the mountain says November 22nd opening day!!!
We can only hope!!
where's the snow where's the snow
Reply |
Open this post in threaded view
 

Re: Gore Conditions

Just about every resort shoots to open earlier than they advertise.  They just set for the date a bit latter incase the weather is an A-hole.  
MikePom MikePom
Reply |
Open this post in threaded view
 

Re: Gore Conditions

Do I dare reset the countdown timer????  
Harvey Harvey
Reply |
Open this post in threaded view
 

Re: Gore Conditions

MikePom wrote
Do I dare reset the countdown timer????

I think so.  Looks like Jamboree this weekend.
"You just need to go at that shit wide open, hang on, and own it." —Camp
snoloco snoloco
Reply |
Open this post in threaded view
 

Re: Gore Conditions

Harvey wrote
MikePom wrote
Do I dare reset the countdown timer????

I think so.  Looks like Jamboree this weekend.
How about the AE2 and Sunway?  I can't wait to ride that lift.
I've lived in New York my entire life.
Thacheronix Thacheronix
Reply |
Open this post in threaded view
 

Re: Gore Conditions

I heard they are going to serve Jamboree with the new high speed lift.  It will be a really fast and cushy ride, but you'll have to do some hiking
Footer Footer
Reply |
Open this post in threaded view
 

Re: Gore Conditions

Thacheronix wrote
I heard they are going to serve Jamboree with the new high speed lift.  It will be a really fast and cushy ride, but you'll have to do some hiking
Na, they'll just turn the sunway chair up to 11.  Everything is better at 11.  

Doubt the AE2 is up for opening.  Chairs go on this week... I assume they have do so a lot of safety, load testing, and tuning stuff to get it going then it has to be certified by the state and such.  I'm sure it will be a few more weeks.  I'm sure it will be running by the 29th.  
Harvey Harvey
Reply |
Open this post in threaded view
 

Re: Gore Conditions

In reply to this post by Thacheronix
Thacheronix wrote
I heard they are going to serve Jamboree with the new high speed lift.  It will be a really fast and cushy ride, but you'll have to do some hiking
Got to admit I blew my coffee out through my nose when I read this Thach.

The 29th sounds reasonable.  Gore speak is now saying things like "soon after opening day."
"You just need to go at that shit wide open, hang on, and own it." —Camp
MikePom MikePom
Reply |
Open this post in threaded view
 

Re: Gore Conditions

Tragically, I will not make it up until post Turkey Day....its sad that I will miss the opener, but I trust you will all take a run for those of us who are still bound by the shackles of life.

So my timer continues to count down.  Now not for opening day, but for that first moment of freedom when this bound slave watches his boards fall to the earth, etching into the frozen granular surface and signaling release from all things non-winter.

The Countdown
Reply
1234 ... 58